SCOTTVILLE — The City of Scottville is considering a temporary moratorium on certain building permits, land divisions and other development approvals involving nonconforming properties and new modular homes while city officials review existing zoning regulations.
The Scottville City Commission is scheduled to consider introducing the proposed ordinance during its regular meeting Monday, Nov. 23. If eventually adopted, the ordinance would establish a moratorium lasting up to 12 months on specified development approvals.
According to a memorandum from City Manager Clarence Goodlein, city officials have become increasingly concerned that existing zoning regulations allow construction and other development activities on properties that do not meet current minimum lot size requirements.
The city’s zoning ordinance, which took effect Feb. 21, 1984, allows certain properties classified as nonconforming lots of record to be developed even though they do not meet current minimum standards for lot area, width or other requirements.
Under Section 153.062 of the city’s zoning ordinance, structures and accessory buildings may be constructed on qualifying nonconforming lots, subject to certain conditions. The ordinance also allows reductions in required yard setbacks under certain circumstances.
Goodlein stated that city administrators have been examining whether those provisions adequately address construction, demolition, land divisions and the placement of modular residential structures.
City officials subsequently consulted with the city attorney, resulting in the preparation of two proposed ordinances designed to temporarily restrict development while the city considers changes to its regulations.
The first ordinance, which is scheduled for introduction Monday, addresses approvals that fall outside the city’s zoning ordinance.
Under the proposal, the city would temporarily suspend issuing or approving building permits, demolition permits, certificates of occupancy, land divisions, lot splits, lot line adjustments, water or sewer connection permits, driveway permits and similar approvals under specified circumstances.
The restrictions would apply to construction or expansion of structures on nonconforming lots when relying on the existing zoning provisions, as well as land divisions or lot line adjustments that would reduce the area or width of such properties.
The proposed ordinance would also temporarily prohibit approvals for the construction or placement of new modular residential structures within the city.
The ordinance defines a modular residential structure as a dwelling consisting of substantially completed sections manufactured at another location and assembled on a permanent foundation. The definition does not include mobile homes or conventional site-built houses that incorporate prefabricated components.
A second proposed ordinance would establish a similar moratorium on zoning-related approvals, including zoning permits, site plans, special land uses and variances involving qualifying nonconforming lots and new modular residential structures.
That proposal has been forwarded to the Scottville Planning Commission, where it is expected to undergo additional review and a public hearing before a recommendation is made to the City Commission.
The city’s Ordinance and Public Safety Committee discussed the proposals during its Nov. 19 meeting.
According to Goodlein’s memorandum, committee members determined that existing approval procedures might not adequately address development on nonconforming lots or the placement of modular residential structures.
The committee recommended that the City Commission introduce the ordinance addressing non-zoning approvals.
The proposed moratorium would give the City Commission and Planning Commission time to examine potential changes to the city’s zoning regulations, including minimum lot sizes, setback requirements, the treatment of adjoining properties under common ownership and compatibility with surrounding neighborhoods.
City officials have indicated that development permitted under the existing ordinance could be inconsistent with changes ultimately adopted.
If enacted, the moratorium would apply to the specified categories of development, including applications pending when the ordinance takes effect.
The restrictions would remain in effect for up to 12 months or until the city adopts applicable amendments to its ordinances, whichever occurs first. The City Commission could extend the moratorium if additional time is needed to complete the review.
The proposal includes limited exceptions where enforcement would conflict with state or federal law. Property owners seeking relief under those circumstances could submit written requests to the City Commission.
The proposed non-zoning ordinance is designated as an emergency ordinance but would not take effect until the later of 15 days after its adoption or publication in a newspaper of general circulation within the city.
No moratorium has been enacted. Monday’s agenda calls for the introduction of the proposed non-zoning ordinance, while the companion zoning proposal remains subject to Planning Commission review.
The Scottville City Commission will meet at 6 p.m. Monday, Nov. 23, at the Scottville Area Senior Center, 140 S. Main St.
______________
Become a subscriber and help keep local news coverage alive
For generations, local newspapers were supported by subscriptions. Today, while Mason County Press and Oceana County Press remain free to everyone, the cost of producing quality local journalism continues to rise.
If you value independent local news coverage, we invite you to help sustain it by subscribing to the MCP/OCP Daily Briefing for $12 a month — about 40 cents a day — or $120 a year.
Your subscription helps support our full time staff of two who cover local government, schools, courts, police news, community events, sports, breaking news and the stories that matter most to Mason and Oceana counties. In return, you’ll receive the MCP/OCP Daily Briefing each morning with the day’s headlines, along with occasional breaking news and special email editions.
Monthly subscriptions are available for $12 per month.
Click here to subscribe monthly.
Annual subscriptions are available for $120 per year.
Click here to subscribe annually.
If you prefer to pay by check, mail your $120 annual payment to:
Media Group 31, LLC
P.O. Box 21
Scottville, MI 49454
Please include your name, mailing address, email address and telephone number so we can activate your subscription.
Subscription payments must be received before service is activated.
Whether you choose to subscribe or continue enjoying our free content, thank you for reading Mason County Press and Oceana County Press. Your readership—and your support—helps ensure that independent local journalism remains available to everyone in our communities, including those who would not be able to afford to pay for a subscription.
This story and original photography are copyrighted © 2026 by Media Group 31, LLC, P.O. Box 21, Scottville, MI 49454. All rights reserved. No portion of this story or its images may be reproduced in any form, including print, broadcast or electronic media, without the express written permission of Media Group 31, LLC.
As a news organization, Media Group 31 maintains published content as part of the public and historical record. Accordingly, stories are not removed after publication. At the editor’s discretion, stories may be updated or corrected as new information becomes available. Updates may be made by revising the original story or by publishing a follow-up story. Media Group 31, LLC reserves the right to modify this policy at any time. Please refer to our Use Policy for additional information.
