Work underway on Badger’s ramp

July 27, 2023

Work underway on Badger’s ramp

LUDINGTON — Crews are currently working on repairing the SS Badger’s loading ramp. On Friday, July 21, at the Ludington dock, one of the two lifting structures for the ramp used to load and unload the ship collapsed into Pere Marquette Lake. There were no injuries to people nor was there damage to the ramp, ship or vehicles. The damage has caused the ship’s service to be temporarily suspended.

On Tuesday, July 25, marine contractors began removing the old ramp lifting equipment, preparing for the installation of a new lifting device.

“While we do not have an exact timeframe, our hope is to have the vessel back in service within the next few weeks,” a press release from Lake Michigan Carferry stated.

This story and original photography are copyrighted © 2023, all rights reserved by Media Group 31, LLC, PO Box 21, Scottville, MI 49454. No portion of this story or images may be reproduced in any way, including print or broadcast, without expressed written consent.

As the services of Media Group 31, LLC are news services, the information posted within the sites are archivable for public record and historical posterity. For this reason it is the policy and practice of this company to not delete postings. It is the editor’s discretion to update or edit a story when/if new information becomes available. This may be done by editing the posted story or posting a new “follow-up” story. Media Group 31, LLC or any of its agents have the right to make any changes to this policy. Refer to Use Policy for more information.

Please consider helping to fund local news. Mason County Press and Oceana County Press are available for free thanks to the generous support of our advertisers and individuals. Three ways to help us: Venmo: @MasonCountyPress; Paypal: MasonCountyPress@gmail.com; Mail a check to PO BOX 21, Scottville, MI 49454. 

fb.com/stars

Eats & Drinks

Eats & Drinks