MCP Boat Blog

Prime departs Ludington

April 27, 2026

Photos and story by Rob Alway, Editor-in-Chief LUDINGTON — The MV Prime departed the Port of Ludington Monday morning. The ship entered port early Sunday morning and docked at the OxyChem Ludington plant, which produces calcium chloride. Its next destination is Loyalist Cove, which is located near Bath, Ontario, Canada along Lake Ontario, about 20 miles west of Kingston, Ontario.…

Read more »

Norwegian-flagged tanker first ship to visit Ludington this season

April 26, 2026

Story and photos by Rob Alway, Editor-in-Chief LUDINGTON — The Norwegian-flagged tanker MV Prime is the first ship to visit the Port of Ludinton this season. The vessel arrived late Saturday night but anchored offhosre west of the mouth of the Lincoln River overnight. The ship entered the harbor just after sunrise Sunday morning, destined for the OxyChem Ludington plant dock…

Read more »

Sunday tug traffic in the Port of Ludington

April 19, 2026

By Rob Alway, Editor-in-Chief LUDINGTON — Two tugboats departed the Ludington channel Sunday afternoon, with one continuing its voyage while the other briefly exited before returning. The tug-and-barge combination Candice Elise and Robert F. Deegan left the OxyChem dock en route to Johnstown, Ontario, on the St. Lawrence River. The vessel makes frequent calls to OxyChem’s Ludington plant as part…

Read more »

Fish net installation preparations underway

April 14, 2026

By Rob Alway, Editor-in-Chief PERE MARQUETTE TOWNSHIP — Two vintage tugboats now docked along the Buttersville Peninsula are preparing to assist with the annual installation of the fish barrier net at Consumers Energy’s Ludington Pumped Storage Plant. The John Henry and Julie Dee, both owned by The King Company of Holland, are currently positioned on Pere Marquette Lake as staging…

Read more »

Tug-barge Meredith Ashton/Robert F. Deegan arrive in Ludington

April 9, 2026

By Rob Alway, Editor-in-Chief LUDINGTON — The articulated tug-barge combination of the Meredith Ashton and the Robert F. Deegan arrived at the Port of Ludington Thursday evening, docking at the Occidental Chemical Corp. (OxyChem) facility on Pere Marquette Lake. The Meredith Ashton, a 95-foot-long, 32-foot-wide tug owned by Ashton Marine Co. of North Muskegon, was built in 1999 by Thoma-Sea…

Read more »

Support Local Journalism

Area Churches