Stephens Road Bridge to close for construction to Aug. 14. FREE SOIL TOWNSHIP — Stephens Road Bridge over the Big Sable River, northeast of the Village of Free Soil, will be under construction starting Monday, August 14. Construction will include removal of the existing 28-feet long by 19-feet wide single-span steel I-beam bridge that was reconstructed in 1987. The…




